Mobile Solar Tower lights

Tank TS800W-9M

Luminaire Efficiency : 195lm/W

Illuminated Area :1200 – 1500㎡

Charging Time:6 Hours

Working Time:More than 115 Hours

Battery Capacity:46080Wh

Inverter Output: AC110V / 240V / 380V

Tank TS800W-9M

Features

  • High performance

  • Emergency lighting

  • 360° Rotation

  • Solar energy

  • Remote control

  • Maximum runtime

Technical Parameters

T800W-9M Control Options LCD panel (Remote Control + PC for your options)
Battery Charging Type Solar + Wind Turbine
Charging Controller MPPT 100A, 95% efficiency
System Voltage DC48V
Working Temperature -20℃ – 50℃
Charging Time 6 hours
Running Time 115 hours
IP rating IP65
Lighting System Type 4*100W LED Flood Lights
Light Output 78000lm
Illuminated area @ 9m 1200 -1500 m2
Rotation / Tilt 360° Rotatable and ±90° Tiltable
Solar Panel + Wind Turbine Solar Panel Wattage 9*460W
Solar Panel Type Mono crystalline Silicon, 21.7% efficiency
Wind Turbine  Rated Power 300W
Starting Wind Speed 1m/s (2.24 mph)
Safety Wind Speed 50m/s (111.85mph)
Wind Turbine Type Vertical axis wind turbines
Battery and Inverter Type Lithium Battery
Battery Pack 3* 300AH   DC51.2V
Battery Capacity 46080Wh
Inverter Output AC110V / 240V / 380V  Sine Wave
Output Connections 2* 16A + AC sockets + 1* 5A , USB2.0
Inverter Power 10KW
Lifting System Type Electric / Manual for your options
Mast Height 2.5 – 9M  Retractable
Wind Resistance Rating Level 8  117KM/H
Material Hot-Dip Galvanized Steel
Trailer Axle Double Axles
Tire and Rim 4*14 inch Pneumatic Tires
Stabilizer 4 Support legs, Manual
Tower Hitch Ball Type, with towing eye ∅70mm, suitable for 50mm trailer ball
Drawbar US / EU / AU standard
Trailer Speed 60 km/h
Shipment Transport Dimension 4947*2211*2564 mm
Deployed Dimension 6028*6295*9000 mm
Total Weight 3200kgs
Loading Plan : 40HQ: 2 pcs

Application Scenario

Construction Sites
Construction Sites
Construction Sites
Construction Sites
Construction Sites
Construction Sites

Customization

  • 01. Consultation

    Discuss and finalize product specifications & requirements with the customer.

  • 02. Design

    Based on customer’s requirements, we will develop and finalize the the design with the approval by customer.

  • 03. Quotation

    Quote the prices and the estimated lead time for customer approval.

  • 04. Sample Preparation & Approval

    Sample fabrication and customer approval

  • 05. Mass Production

    According to customer approved product requirements and shipment date, we can start the quality-controlled mass production

  • 06. Shipment

    On-time shipment

Related Products

Online Message

I have read and accept the Privacy Policy.*

Send