01. Consultation
Discuss and finalize product specifications & requirements with the customer.
Mobile Solar Tower lights
Explore T600-12M
Luminaire Efficiency : 195LM/W
Illuminated Area :2500 – 2800㎡
Charging Time: 6.9 Hours
Working Time:More than 16Hour
Battery Charging Type: Solar and Electric
Features
High performance
Emergency lighting
360° Rotation
Solar energy
Remote control
Maximum runtime
Technical Parameters
T600-12M | Control Options | LCD panel (Remote Control + PC for your options) |
PV Controller | MPPT 80A, 95% efficiency | |
System Voltage | DC48V | |
Working Temperature | -20℃ – 50℃ | |
Charging Time | 6.9 hours | |
Running Time | 16 hours | |
IP rating | IP65 | |
Lighting System | Type | 6*200W LED Flood Lights |
Light Output | 234000lm | |
Illuminated area @ 12m | 2500 – 2800 m2 | |
Rotation / Tilt | 360° Rotatable and ±120° Tiltable | |
Solar Panel | Solar Panel Wattage | 6*460W |
Solar Panel Type | Mono crystalline Silicon, 21.7% efficiency | |
Battery and Inverter | Type | Lead-acid ( Lithium for your option) |
Battery Pack | 8* 200AH DC12V 19200Wh | |
Inverter Output | AC110V / 240V Sine Wave | |
Output Connections | 1* 16A + AC sockets + 1* 5A , USB2.0 | |
Inverter Power | 3KW | |
Lifting System | Type | Electric / Manual / Hydraulic for your options |
Mast Height | 2.5 – 12M Retractable | |
Wind Resistance Rating | Level 8 117KM/H | |
Material | Hot-Dip Galvanized Steel | |
Trailer | Axle | Double |
Tire and Rim | 4*15 inch Pneumatic Tires | |
Stabilizer | 4 Support legs, Manual | |
Tower Hitch | Ball Type, with towing eye ∅70mm, suitable for 50mm trailer ball | |
Drawbar | US / EU / AU standard | |
Trailer Speed | 80 km/h | |
Shipment | Transport Dimension | 2050*1883*2564mm |
Deployed Dimension | 4700*6500*12000mm | |
Total Weight | 2800kgs | |
Loading Plan | 40HQ: 6pcs |
Application Scenario
Customization
01. Consultation
Discuss and finalize product specifications & requirements with the customer.
02. Design
Based on customer’s requirements, we will develop and finalize the the design with the approval by customer.
03. Quotation
Quote the prices and the estimated lead time for customer approval.
04. Sample Preparation & Approval
Sample fabrication and customer approval
05. Mass Production
According to customer approved product requirements and shipment date, we can start the quality-controlled mass production
06. Shipment
On-time shipment
Related Products