01. Consultation
Discuss and finalize product specifications & requirements with the customer.
Mobile Power Stations
Tank S800W-70
Output Capacity : 76KWh
Voltage Wave Type : Sine Wave
Output Voltage : AC110V/AC220V/380V
Inverter Output Power : 10000W
Charging Time: 8 Hours
Solar Panel + Wind Turbine
Features
Solar energy
Emergency electricity
Intelligence
Multiple voltages
Technical Parameters
S800-70M | Control Options | LCD panel (Remote Control + PC for your options) |
PV Controller | MPPT 100A, 95% efficiency | |
System Voltage | DC48V | |
Working Temperature | -20℃ – 50℃ | |
Charging Time | 8 hours | |
IP rating | IP65 | |
Solar Panel + Wind Turbine | Solar Panel Wattage | 9*460W |
Solar Panel Type | Mono crystalline Silicon, 21.7% efficiency | |
Wind Turbine Rated Power | 300W | |
Starting Wind Speed | 1m/s (2.24 mph) | |
Safety Wind Speed | 50m/s (111.85 mph) | |
Wind Turbine Type | Vertical axis wind turbines | |
Battery and Inverter | Type | Lithium Battery |
Battery Pack | 5* 300AH DC51.2V | |
Battery Capacity | 76800Wh | |
Inverter Output | AC110V / 240V / 380V Sine Wave | |
Output Connections | 2* 30A + 1* 5A + AC sockets, USB2.0 | |
Inverter Power | 10KW | |
Lifting System | Type | Electric / Manual for your options |
Wind Resistance Rating | Level 8 117KM/H | |
Material | Hot-Dip Galvanized Steel | |
Trailer | Axle | Double Axles |
Tire and Rim | 4*14 inch Pneumatic Tires | |
Stabilizer | 4 Support legs, Manual | |
Tower Hitch | Ball Type, with towing eye ∅70mm, suitable for 50mm trailer ball | |
Drawbar | US / EU / AU standard | |
Trailer Speed | 60 km/h | |
Shipment | Transport Dimension | 4947*2211*2564 mm |
Deployed Dimension | 6028*6295*9000 mm | |
Total Weight | 3200kgs | |
Loading Plan : | 40HQ: 2 pcs |
Application Scenario
Customization
01. Consultation
Discuss and finalize product specifications & requirements with the customer.
02. Design
Based on customer’s requirements, we will develop and finalize the the design with the approval by customer.
03. Quotation
Quote the prices and the estimated lead time for customer approval.
04. Sample Preparation & Approval
Sample fabrication and customer approval
05. Mass Production
According to customer approved product requirements and shipment date, we can start the quality-controlled mass production
06. Shipment
On-time shipment
Related Products